AT A GLANCE

Asset Type

Unmanned Offshore Production Platform

Location

North Sea

Working Medium

Refrigerant, Process Hydrocarbons, Methanol

Max Contained Pressure

21 bar

Flange Sizes

½" – 12"

Flange Classes

150#, 300#, 600#

Number of Flanges

127

Project Scope

Hot Bolting on live pipe systems, Integrity Assessment, MorSafeā„¢ Clamp Deployment

The Challenge

After years of continuous operation in harsh North Sea conditions, the operator’s unmanned platform was showing accelerated fastener corrosion across more than 100 four-bolt flanges. Under the operator’s governing procedures, hot bolting of four-bolt or hydrocarbon-containing flanges is not permitted without verified additional restraint. With the asset carrying pressurised gases and liquids, the corrosion posed a real risk of bolt failure, and potentially dangerous leaks. The challenge was clear: restore flange integrity, reduce risk, and extend the life of the platform - without interrupting production.

The Hydratight Solution

Hydratight deployed a multi-disciplinary team of integrity engineers and bolting specialists to conduct a full assessment of the affected flanges and perform hot bolting on live pipe systems.

1. Comprehensive Data-Led Assessment

Using joint application surveys and a structured database approach, Hydratight catalogued key operating and mechanical parameters, including:

Flange alignment

Media type

- Line pressures and temperatures

- Corrosion condition and bolt condition

Engineering reviews were then cross-referenced with the operator’s hot-bolting certification requirements to confirm suitability for controlled bolt replacement.

2. Deployment of MorSafeā„¢ Clamps for Safe Hot Bolting

Hydratight recommended its MorSafeā„¢ restraint system for all applicable flanges.

The MorSafeā„¢ clamp:

- Encases the flange to prevent any load release on the gasket

- Maintains joint integrity during bolt exchange

- Fits a wide range of geometries due to its compact profile

For this campaign, clamps were mobilised for flange sizes DN15 (½") to DN300 (12") across classes up to 600#, handling pressures up to 21 bar.

3. Planned, Controlled, Zero-Disruption Execution

Forward planning between Hydratight and the operator ensured the highest-risk flanges received additional controls, while other flanges proceeded safely with MorSafeā„¢ support.

The result: a streamlined, predictable, and fully compliant hot-bolting programme offshore.

The Results

Hydratight successfully upgraded all identified ā€œat-riskā€ flanges with zero downtime and zero incidents, preventing an otherwise unavoidable shutdown. Key outcomes:

250 man-hours of shutdown avoided

Improved long-term asset integrity

Increased productivity through more flanges upgraded per shift

Reduced disruption to offshore operations

Complete adherence to client safety and procedural requirements