AT A GLANCE

Asset Type

FPSO (Floating Production, Storage & Offloading Unit)

Build Location

South Korea

Final Location

UK – North Sea

Project Phases

Construction, Hook-up & Commissioning

Special Requirements

High concentration of 4-bolt hub connectors & Taper-Lok® vendor-specific flanges

Total Connections Managed

55,000+ flanged joints

The Challenge

The construction contractor for the Goliat FPSO required a complete, end-to-end joint integrity assurance solution to support the build of a highly complex offshore asset.

High volume of critical connections

The design incorporated an unusually large number of 4-bolt hub connectors and proprietary Taper-Lok® flanges—each requiring specialist installation, controlled tightening procedures, and rigorous inspection.

Need for full lifecycle traceability

The operator required transparent, traceable records from construction through hook-up and commissioning in the UK.

Manpower expertise

Specialist joint integrity engineers and inspectors were essential to ensure safety, accuracy, and leak-free start-up.

Schedule pressure

Maintaining asset integrity while meeting construction and commissioning deadlines was critical to avoid costly downtime.

In short: the project needed a proven integrity assurance partner with the right software, the right process, and the right people.

The Hydratight Solution

Hydratight delivered a fully integrated joint integrity assurance programme built around a combination of specialist personnel and the iDMSâ„¢ joint management system.

Digital Integrity Management with iDMSâ„¢

iDMS was built using original design data and deployed onsite to manage all work scopes.

Joint Integrity Engineers generated detailed work packs and controlled documentation for every connection.

All inspection and tightening data was captured and recorded, creating a live, traceable database for the client.

Specialist Manpower – Engineers & Inspectors

Hydratight Joint Integrity Engineers supervised the work and ensured correct installation and controlled tightening procedures for hub connectors andTaper-Lok flanges.

Joint Integrity Inspectors verified work in the field and updated iDMS with real-time progress and completions.

During hook-up and commissioning, Hydratight personnel built leak test packs and documented verification results, supporting a safe and confident start-up.

Seamless Handover from Yard to Offshore Operations

Because iDMS was used consistently from construction through commissioning, the operator received a fully traceable, structured record of every flange and every activity—ensuring continuity, compliance, and reduced risk.

Results

Hydratight’s integrity assurance programme provided the contractor and operator with:

Leak-free execution

Controlled tightening and verification significantly reduced leaks at test.

Full lifecycle traceability

A complete history of every managed connection—from construction through operation.

Improved safety & compliance

Competent, trained personnel ensured correct installation and verification on all specialised connectors.

Clear visibility & control

iDMS delivered transparent tracking, progress reporting, and assured handover between construction yard, commissioning teams, and operations.

Confidence in start-up

Verified leak test data gave the client assurance in the completeness and integrity of all work packages.

READY TO STRENGTHEN ASSET INTEGRITY?

Hydratight helps operators and EPCs reduce leaks, minimise downtime,
and safeguard personnel with proven joint integrity management
systems and expert manpower.

✖